Connaught Bridge Power Station is one of the oldest power stations in Malaysia.
It was opened on 26 March 1953 by the High Commissioner for the Federation of Malaya, His Excellency General Sir Gerald Templer. The station has nonetheless kept in constant move with changing times. It is today one of the most efficiently run in the country.
The Station has an installed generation capacity of 895 MW, the third largest of seven sister TNB power plants in the country. The power is produced through a combined-cycle block producing 315 MW, and 4 x GT13E1 open cycle gas turbines of 130 MW each.
As part of the Generation Division of the Tenaga Nasional Group of Malaysia, it shares and operates in support of the parent group’s targets and objectives.
A steam turbine.
| This article about a Malaysian building or structure related topic is a stub. You can help pedia by expanding it. |
| This article about a power station is a stub. You can help pedia by expanding it. |